FCC Issued Notice of Proposed Rulemaking
on mmWave (and higher) spectrum
The FCC issued a long-anticipated Notice of Proposed Rulemaking under ET Docket 18-21 on February 28, 2018 and seeks "comment on proposed rules to permit licensed fixed point-to-point operations in a total of 102.2 gigahertz of spectrum; on making 15.2 gigahertz of spectrum available for unlicensed use; and on creating a new category of experimental licenses to increase opportunities for entities to develop new services and technologies from 95 GHz to 3 THz with no limits on geography or technology."
This is a broad NPRM with a lot of impact towards development of technologies and testing methods, truly pushing the state-of-the-art.
ACB is active with the mmWave Coalition, the TCB Council and American Council of Independent Laboratories on comments to this NPRM. We will likely see communications technologies that will extend into the hundreds of GHz, which will bear great impact on 5G and IoT applications into the next decade.
The comment period ends 30 days after the February 28 issue date.
Certification and Compliance Updates Questions and Answers
-
UWB产品FCC认证时,需要测试的技术特性可以参考的要求是什么?
Question:
What technical characteristics must be measured to demonstrate ultra-wideband (UWB) device compliance to the applicable requirements specified in Part 15 Subpart F?
view answer
-
无线键盘作为附件的产品怎样进行SAR评估?
Question: One of our clients has a wireless keyboard that tends to be used along with iPad, as an accessory.
The product is a very low power device that must comply with FCC Part 15.249 rule.
Kindly advise if a TCB can directly certify this project (w/o SAR evaluation) or this device is to consider SAR when it works along with iPad?
view answer
-
EU RED公布在OJ上的协调标准于2018年2月9日更新。
EU RED HS Listing Update An updated EU Radio Equipment Directive (RED)
list of Harmonized Standards was published in the Official Journal of the European Union on 9 February 2018. You can download a free PDF at this link.
-
KDB865664 D01中需要在报告中添加系统验证的结果。
Please note that the SAR System Validation data required by KDB865664)D01)3.3.1) is different than the SAR System Verification tests, which were correctly performed and included in the report. The System Validation test is more like an ISO/IEC 17025 requirement… please see Section 3.3.1 of the referenced KDB Publication, which states, in part, that ’’ a tabulated summary of the system validation status, according to the validation date(s), measurement frequencies, SAR probes, calibrated signal type(s) and tissue dielectric parameters, is required in the SAR report.” In the future, please begin to also include the SAR System Validation data, similar to that shown below, but specific to your own test equipment, in your SAR reports, as required.
Detailed system validation results must be maintained by each test laboratory, which are normally not required for equipment approval. Only a tabulated summary of the system validation status, according to the validation date(s), measurement frequencies, SAR probes, calibrated signal type(s) and tissue dielectric parameters, is required in the SAR report. However, when questions arise or details are required due to probe conversion linearity or other measurement concerns, the relevant system validation results may be required in SAR reports to support the measurement results for equipment approval.
-
FCC于近期更新了KDB,KDB172838& KDB711889已被KDB88861覆盖,KDB965270被KDB940660覆盖。
Publication Number |
Question |
Answer |
888861 |
What are the requirements for certification of GMRS and FRS radios that operate under Part 95? |
The attached document, 888861 D01 Part 95 GMRS FRS v01, provides guidance for the certification of GMRS and FRS radios under the rules in Part 95. |
227764 |
What equipment is
considered to be
Indus-trial
Scientific and
Medical (ISM)
subject to Part 18? |
Attachment 227764
D01 ISM Equipment
v01 provides
guidance of the
classification of
ISM equipment
subject to Part 18. |
940660 |
What procedures
should be used to
evaluate Citizens
Broadband Radio
Service (CBRS) for
compliance under
Part 96? |
Attachment 940660
D01 Part 96 CBRS
Eqpt v01 pro-vides
guidance on
applicable approval
procedures,
technical
requirements, and
Part 96 Citizens
Broad-band Radio
Service (CBRS)
interaction with
Spectrum Access
System (SAS)
evaluation. |
552295 |
What are the
guidelines for
providing a
Contention Based
Protocol (CBP)
operational
description, as
required by Part
90Z? |
Guidelines are
provided in the
attachment below
552295 CBP Guidance
for 3650-3700 Band
v03. |
393764 |
What guidance is
available for the
approval of
Ultra-Wide Band
devices? |
See attachment
393764 D01 UWB FAQ
v02 for a list of
frequently asked
questions. This
attachment is a
compilation of
frequently asked
questions previously
published in this
publication and have
been updated to
reflect the recent
changes (July 2015)
in meas... |
|