Certification and Compliance Updates

2018年2月期

FCC Issued Notice of Proposed Rulemaking
on mmWave (and higher) spectrum

The FCC issued a long-anticipated Notice of Proposed Rulemaking under ET Docket 18-21 on February 28, 2018 and seeks "comment on proposed rules to permit licensed fixed point-to-point operations in a total of 102.2 gigahertz of spectrum; on making 15.2 gigahertz of spectrum available for unlicensed use; and on creating a new category of experimental licenses to increase opportunities for entities to develop new services and technologies from 95 GHz to 3 THz with no limits on geography or technology."

This is a broad NPRM with a lot of impact towards development of technologies and testing methods, truly pushing the state-of-the-art.

ACB is active with the mmWave Coalition, the TCB Council and American Council of Independent Laboratories on comments to this NPRM. We will likely see communications technologies that will extend into the hundreds of GHz, which will bear great impact on 5G and IoT applications into the next decade.

The comment period ends 30 days after the February 28 issue date.

View PDF




Certification and Compliance Updates
Questions and Answers

  1. UWB产品FCC认证时,需要测试的技术特性可以参考的要求是什么?

    Question: What technical characteristics must be measured to demonstrate ultra-wideband (UWB) device compliance to the applicable requirements specified in Part 15 Subpart F? view answer

  2. 无线键盘作为附件的产品怎样进行SAR评估?

    Question: One of our clients has a wireless keyboard that tends to be used along with iPad, as an accessory. The product is a very low power device that must comply with FCC Part 15.249 rule. Kindly advise if a TCB can directly certify this project (w/o SAR evaluation) or this device is to consider SAR when it works along with iPad? view answer

  3. EU RED公布在OJ上的协调标准于2018年2月9日更新。

  4. EU RED HS Listing Update An updated EU Radio Equipment Directive (RED) list of Harmonized Standards was published in the Official Journal of the European Union on 9 February 2018. You can download a free PDF at this link.

  5. KDB865664 D01中需要在报告中添加系统验证的结果。

  6. Please note that the SAR System Validation data required by KDB865664)D01)3.3.1) is different than the SAR System Verification tests, which were correctly performed and included in the report. The System Validation test is more like an ISO/IEC 17025 requirement… please see Section 3.3.1 of the referenced KDB Publication, which states, in part, that ’’ a tabulated summary of the system validation status, according to the validation date(s), measurement frequencies, SAR probes, calibrated signal type(s) and tissue dielectric parameters, is required in the SAR report.” In the future, please begin to also include the SAR System Validation data, similar to that shown below, but specific to your own test equipment, in your SAR reports, as required. Detailed system validation results must be maintained by each test laboratory, which are normally not required for equipment approval. Only a tabulated summary of the system validation status, according to the validation date(s), measurement frequencies, SAR probes, calibrated signal type(s) and tissue dielectric parameters, is required in the SAR report. However, when questions arise or details are required due to probe conversion linearity or other measurement concerns, the relevant system validation results may be required in SAR reports to support the measurement results for equipment approval.

  7. FCC于近期更新了KDB,KDB172838& KDB711889已被KDB88861覆盖,KDB965270被KDB940660覆盖。

    Publication Number Question Answer
    888861 What are the requirements for certification of GMRS and FRS radios that operate under Part 95? The attached document, 888861 D01 Part 95 GMRS FRS v01, provides guidance for the certification of GMRS and FRS radios under the rules in Part 95.
    227764 What equipment is considered to be Indus-trial Scientific and Medical (ISM) subject to Part 18? Attachment 227764 D01 ISM Equipment v01 provides guidance of the classification of ISM equipment subject to Part 18.
    940660 What procedures should be used to evaluate Citizens Broadband Radio Service (CBRS) for compliance under Part 96? Attachment 940660 D01 Part 96 CBRS Eqpt v01 pro-vides guidance on applicable approval procedures, technical requirements, and Part 96 Citizens Broad-band Radio Service (CBRS) interaction with Spectrum Access System (SAS) evaluation.
    552295 What are the guidelines for providing a Contention Based Protocol (CBP) operational description, as required by Part 90Z? Guidelines are provided in the attachment below 552295 CBP Guidance for 3650-3700 Band v03.
    393764 What guidance is available for the approval of Ultra-Wide Band devices? See attachment 393764 D01 UWB FAQ v02 for a list of frequently asked questions. This attachment is a compilation of frequently asked questions previously published in this publication and have been updated to reflect the recent changes (July 2015) in meas...

 

View PDF


  

American Certification Body, Inc.
6731 Whittier Avenue, Suite C110
McLean, VA 22101
Office: 703-847-4700
http://acbcert.com

Online Version | Contact Us

 If you no longer wish to receive emails from ACB you may {[EM-OPT OUT]} at any time.