Technical updates and regulatory highlights for November 2026.
This month’s ACB Regulatory Update covers FCC Daily Digest notices, the U.S. Cyber Trust Mark program, ultra-wideband modernization, Covered List component restrictions, ISED RSS-247 Amendment 1, FCC laboratory recognition and reciprocity rules, FCC Knowledge Database updates, and the European Commission’s updated Radio Equipment Directive Guide.
Download the November 2026 ACB Regulatory Newsletter (PDF)
In This Issue
- 1. FCC Device Test Lab Onshoring and Reciprocity Rules
- 2. FCC Covered List Component Restrictions
- 3. ISED RSS-247 Issue 4, Amendment 1
- 4. FCC Ultra-Wideband Modernization Proposal
- 5. U.S. Cyber Trust Mark Accreditation Bodies
- 6. FCC Daily Digest Notices
- 7. FCC KDB Publication 388624
- 8. European Commission RED Guide
- 9. International Approvals Highlights
1. FCC Proceeds on Device Test Lab Onshoring, Reciprocity Rules

FCC 推进设备测试实验室本土回迁及对等互认规则
On October 29, 2026, the Federal Communications Commission adopted final rules changing the regulatory framework governing recognition of testing laboratories involved in equipment authorization. Before electronic devices subject to FCC equipment authorization requirements can be marketed or used in the United States, applicable testing must be performed by an FCC-recognized laboratory.
The FCC’s action is intended to strengthen this framework by ensuring fair and reciprocal treatment for U.S. industries. Specifically, the Order limits FCC recognition of testing laboratories to those located in the United States or in countries that grant reciprocal recognition to U.S. laboratories.
Manufacturers, laboratories, and certification applicants should review the final Order when planning testing and equipment authorization activities.
Official FCC Sources:
2. FCC Blocks Two Devices Containing Foreign Surveillance Chips

FCC 叫停两款搭载境外监控芯片的设备
On October 22, 2026, the FCC announced its first enforcement action under the Commission’s component-part rules. The FCC’s Office of Engineering and Technology prevented two devices — a dashboard camera and a wireless video transmitter — from being marketed or sold in the United States after determining that they contained chips produced by HiSilicon, a subsidiary of Huawei and an entity on the FCC Covered List.
According to the FCC announcement, HiSilicon markets the chip for surveillance applications and identifies built-in human-face detection capabilities.
The action follows the implementation of FCC rules prohibiting authorization of certain devices containing logic-bearing, or smart, components produced by entities on the Covered List. The component restrictions became effective on October 13, 2026.
Manufacturers should review 47 CFR § 2.903(b)(2) and the applicable FCC Covered List requirements when evaluating component sourcing and equipment authorization.
Official Regulatory References:
3. ISED RSS-247 Issue 4, Amendment 1 Published

RSS-247 Issue 4 修订 1 正式发布
Innovation, Science and Economic Development Canada published Amendment 1 to RSS-247, Issue 4, on October 8, 2026. RSS-247 Issue 4 was originally published on July 24, 2025. Amendment 1 updates Section 7.3.6.3, Operational Requirements, following publication of RSS-Gen Issue 6.
Section 7.3.6.3 — Operational Requirements
Devices must comply with the applicable dynamic frequency selection (DFS) requirements described below. Client devices without radar detection capability are required to comply only with the channel move time and channel closing transmission time requirements specified in items (c) and (d).
- (a) In-service monitoring: An LE-LAN device must monitor its operating channel to determine whether a co-channel radar system has started operating or moved within range. The radar detection function continuously searches for radar signals between normal LE-LAN transmissions.
- (b) Channel availability check time: Before initiating transmission on a channel or moving to another channel, the device must check whether a radar system is already operating. The device may begin using the channel when no radar signal exceeding the interference threshold specified in Section 7.3.6.2 is detected within 60 seconds. This requirement applies only in controller operational mode.
- Special condition for 5600–5650 MHz: For devices whose emission bandwidth falls completely or partly within this band, the channel availability check time is 10 minutes when using the ETSI EN 301 893 test procedure.
- (c) Channel move time: After radar detection, the device must cease all transmissions on the operating channel within 10 seconds.
- (d) Channel closing transmission time: The permitted closing transmission time consists of 200 milliseconds beginning at the start of the channel move time, plus an aggregate of 60 milliseconds of intermittent control signals needed to facilitate the channel move during the remaining 10-second period.
- Transmission duration calculation: Quiet periods between transmissions are not included when calculating the aggregate duration of transmissions.
- Special closing transmission condition: For devices whose emission bandwidth falls completely or partly within 5600–5650 MHz, the channel closing transmission time is one second when using the ETSI EN 301 893 test procedure.
- Non-occupancy period: A channel identified as containing a radar signal through either the channel availability check or in-service monitoring is subject to a 30-minute non-occupancy period. During that period, the LE-LAN device cannot use the channel. The period begins when the radar signal is detected.
Manufacturers and testing laboratories should review the amended RSS-247 standard and applicable RSS-Gen requirements when preparing test procedures and certification documentation.
Official ISED Source: ISED RSS-247 — Section 7.3.6.3
4. FCC Proposes Modernization of Ultra-Wideband Technology Rules

FCC 提出超宽带技术规则现代化方案
The FCC issued a Notice of Proposed Rulemaking proposing modernization of its Part 15 ultra-wideband (UWB) rules. The proposal reflects current UWB applications, seeks to simplify compliance, and supports innovation while protecting incumbent radio services.
The NPRM addresses updated equipment definitions, measurement procedures, and operating restrictions. It also proposes a new device category to accommodate emerging UWB applications.
These changes remain proposals rather than final regulatory requirements.
Official FCC Source: FCC — Ultra-Wideband Modernization NPRM (PDF)
5. FCC Recognizes Accreditation Bodies for U.S. Cyber Trust Mark Program

FCC 认可美国网络信任标识项目的认可机构
On September 28, 2026, the FCC announced recognition of two accreditation bodies supporting the U.S. Cyber Trust Mark (USCTM) Program: the American Association for Laboratory Accreditation (A2LA) and the ANSI National Accreditation Board (ANAB).
The FCC determined that these organizations demonstrated the credentials, qualifications, and competence necessary to assess Cybersecurity Label Administrators (CLAs) and CyberLABs participating in the program.
Accreditation Requirements
The recognized bodies demonstrated qualifications and capabilities including accreditation to ISO/IEC 17011, qualifications to accredit CLAs under ISO/IEC 17065 and CyberLABs under ISO/IEC 17025, technically competent personnel, and established procedures for accreditation under the U.S. Cyber Trust Mark Program.
The recognition supports the conformity assessment infrastructure needed for cybersecurity labeling of eligible consumer Internet of Things products.
Official FCC Source: FCC Public Notice DA-26-1029 (PDF)
6. FCC Daily Digest — Conditional Approvals and Covered List Exemptions

来自 FCC Daily Digest 的信息
The FCC’s Public Safety and Homeland Security Bureau issued several notices addressing conditional approvals and exemptions from the FCC Covered List for certain uncrewed aircraft systems, routers, power inverters, and advanced robotic devices.
DA-26-1063 — Covered List Conditional Approvals
The Bureau announced conditional approvals and exemptions for certain uncrewed aircraft systems, routers, and advanced robotic devices.
DA-26-1089 — GE Grid Solutions
On October 8, 2026, the FCC received a National Security Determination from DoW granting conditional approvals for GE Grid Solutions, LLC equipment, including FLEXINVERTER 1.5kV Solar, FLEXINVERTER 1.5kV BESS, FLEXINVERTER 2KV Solar, and FLEXINVERTER SiC Variant power inverters.
DA-26-1114 — Robotic Systems and Power Inverters
On October 15, 2026, the FCC received National Security Determinations from DoW granting conditional approvals for Volley Automation, Inc. automated guided vehicles and autonomous mobile robots (AGV/AMR); Dynapower Company, LLC CPS-2500, CPS-1250, and MPS-125 series power inverters; and Power Electronics España, S.L.U. GEN3 platform utility-scale solar power inverters, including HEM and PCSM & Multi PCSM bidirectional battery storage inverters.
DA-26-1130 — Routers and Mobile Robotics
Additional conditional approvals were granted for Micro-Star International Co., Ltd.’s Radix series GRBE94 and GRBE36 routers and Vulcan Robotics Inc.’s Sourccey mobile robotic platform.
DA-26-1154 — Additional Covered List Determinations
On October 23, 2026, the Bureau announced additional conditional approvals and exemptions involving certain uncrewed aircraft systems, routers, power inverters, and advanced robotic devices.
Manufacturers and certification applicants should consult the individual FCC notices to determine the precise scope and conditions of each authorization or exemption.
Official FCC Public Notices:
7. FCC KDB Updates — Publication 388624

近期 FCC KDB 更新
FCC Knowledge Database Publication 388624 addresses the circumstances under which a Telecommunication Certification Body must obtain FCC guidance before issuing an equipment authorization grant. The publication provides procedures for Pre-Approval Guidance (PAG) under 47 CFR § 2.964.
The PAG process was formerly known as Permit But Ask (PBA). Publication 388624 D01 Pre-Approval Guidance Procedure v13 provides the applicable PAG procedure.
Applicants and TCBs should review the current guidance to determine when FCC involvement is required before granting certification.
Official FCC Source: FCC KDB Publication 388624
8. European Commission Publishes Updated Radio Equipment Directive (RED) Guide

欧盟委员会发布更新版无线电设备指令(RED)指南
The European Commission published an updated Guide to the Radio Equipment Directive, dated July 7, 2026. The document provides interpretive guidance supporting implementation of Directive 2014/53/EU.
The guide addresses topics relevant to manufacturers, conformity assessment bodies, and testing organizations, including radio equipment scope, conformity assessment, technical documentation, and interpretation of applicable regulatory provisions.
The guide is an interpretive reference and does not independently establish new legal obligations.
Official European Commission Sources:
International Approvals Highlights
The following two international regulatory developments are highlighted from ACB’s November International Approvals coverage. Additional country updates are available in the complete November newsletter PDF.
Argentina — RAMATEL Registration Transition
阿根廷:ENACOM 将 RAMATEL 新注册制度延期至 2026 年 12 月 1 日生效
On August 26, 2026, ENACOM issued Resolution 843/2026 postponing implementation of the new RAMATEL registration system established under Resolution 57/2026. The implementation date was moved from September 1, 2026, to December 1, 2026.
Before December 1, RAMATEL registrations continue under the original procedure established by Resolution 729/80. Certificates issued under the previous rules retain their three-year validity. Certificate holders must migrate to the new requirements upon expiration; otherwise, registrations will be cancelled automatically.
The extension provides wireless equipment manufacturers and exporters additional time to prepare for the revised registration requirements.
Official Source: Argentina — ENACOM Resolution 843/2026 (Full Text)
Saudi Arabia — SASO 3114:2026 for ICT Equipment
沙特阿拉伯:SASO 3114:2026 将取代 SASO CITC GEN-002(ICT 设备)
Saudi Arabia’s SASO 3114:2026, “Requirements for Specific ICT Equipment,” replaces SASO CITC GEN-002 under the Technical Regulation for Communications and Information Technology Devices.
The transition period ended October 31, 2026. Beginning November 1, 2026, importers and local manufacturers cannot obtain Certificates of Conformity for covered products unless they comply with SASO 3114:2026.
Covered product categories: Mobile phones, tablets and mobile computers, routers and Customer Premises Equipment (CPE), Optical Network Terminals (ONT), Home Access Gateways (HAG), and Wi-Fi distribution devices.
Existing Certificates of Conformity and Shipment Certificates issued under SASO CITC GEN-002 will be discontinued no later than March 31, 2027.
Manufacturers exporting covered ICT products to Saudi Arabia should review existing compliance documentation, technical files, and test reports to determine whether they meet SASO 3114:2026. Recommended preparation includes reviewing current certification projects, conducting a gap assessment, reviewing certificate transition requirements, and coordinating with certification bodies to confirm compliance readiness.
Official Source: SABER — SASO 3114:2026 Standard Update Notice (PDF)
Disclaimer
This newsletter is provided for general informational purposes only. Regulatory requirements, technical standards, certification procedures, and market access requirements may change without notice.
Readers should consult official regulatory publications and applicable authorities to confirm current requirements before making product design, testing, certification, or market access decisions. American Certification Body, Inc. assumes no responsibility for errors, omissions, or actions taken based on this publication.
Need Assistance?
ACB can help you understand how changing regulatory requirements may affect your equipment authorization and certification plans.
Download the Complete November 2026 Newsletter (PDF)
Contact: certification@acbcert.com
American Certification Body, Inc.
3060 Williams Drive, Suite 300 #104
Fairfax, VA 22031
United States
